Pipe & Modular Fabrication

Scheck Industries fabrication facilities provide the Company a platform for growth and the scale to manage multiple capital projects while driving production with a core team in a state-of-the-art controlled and efficient manufacturing environment. In 2008, Scheck Industries expanded its fabrication capabilities by opening an additional fabrication facility in Joliet, Illinois near the Company’s headquarters 40 miles southwest of Chicago strategically located in a national distribution and transportation hub. Scheck continues to invest which results in more efficient service while lowering pricing to our clients Scheck Industries Fabrication facilities provide improved service by utilizing composite crews in controlled facilities in lieu of field fabrication.

Both facilities currently work under the U.A. National Pipe Fabrication Agreement, and are Charter Members of the Pipe Fabrication Institute. Scheck Industries holds the following stamps for work at both locations: “U”, “R”, “S”, “PP”. The facilities are equipped to perform associated production such as; Non Destructive Examination, Hydrostatic Testing, painting, and post-weld heat treatment. Scheck Industries maintains a policy of providing fabrication facilities to their own specific projects, allowing both fabrication facilities to offer incredible flexibility for both production and delivery schedules.

Our technical expertise demonstrated by a core and tenured management team applies to a variety of products all of which we are equipped to fabricate. The following illustrates the versatility of our fabrication facilities:

Capabilities
  • Pipe Spools
  • Skid Mounted Modules in Excess of 20 Ton
  • Rack Mounted Process Piping
  • Stairways, Catwalks, Platforms and Handrails
  • Pipe Supports and Engineered Hangers
  • Field Verification and Installment Services of All Fabrication Upon Request
Affiliations
  • Pipe Fabrication Institute (PFI)
  • American Society of Mechanical Engineers (ASME)
  • American Welding Society (AWS)
  • TAPPI
  • Mechanical Contractors Association (MCA)
  • Signatory to United Association (Local 400 & Local 597)
  • Commercial Pipe Fabrication Agreement (UA Label)
Shop Information
  • 100,000 Square Feet Under Roof (Additional 60,000 Square Feet Available as Needed) on the same property
  • Shop Separation of Stainless Steel and Carbon Steel Fabrication
  • Fulltime Quality Control Staff to Provide All Necessary Documents Upon Request
  • Six (6) Acre Site for Storage
  • Two (2) Fifteen Ton Bridge Cranes
  • Two (2) Five Ton Bridge Cranes
  • Three (3) Two Ton Bridge Cranes
  • 18 Jib Cranes (1/2 and 1 Ton)
  • 30 Ton Mobile Yard Crane
  • 15 Panjiris Positioner
  • Two (2) Peerless 18" Vertical Band Saws
  • Two (2) Panjiris Turning Rolls (6,000#)
  • Spartan 66 Ton Ironworker
  • End Preparation
    • 3”-48” Vernon Flame/Plasma Pipe Beveller
    • Two (2) George Fischer 2”-6” Pipe Cutters
    • Tri Tool Portable Milling Machines (4" thru 24")
    • H&M Bevellers (with Plasma Capability)
Welding Qualifications
  • All Welders Qualified to ASME Section IX
  • Welding Processes GTAW, SMAW, GMAW, FCAW and Orbital
  • Welding in Accordance with ASME B31.1 and B31.3
Types of Materials
  • Carbon Steel
  • Stainless Steel
  • Alloys (Including P91)
  • Titanium
  • Monel
  • Aluminum
Non-Destructive Examination
  • Dye Penetrant
  • Magnetic Particle
  • Ultra Sonic
  • X-ray
  • Pre/Post Weld Heat Treating
Certificates of Authorization
  • ASME “PP”
  • ASME “U”
  • ASME “S”
  • National Board “R”
  • National Board “NB”
Industries Served
  • Power/Co-Generation
  • Pulp and Paper
  • Chemical/Petrochemical
  • Refinery
  • Food, Beverage and Pharmaceutical
  • Waste Management

CONTACT

Steve Beam

Steve Beam

(920) 759-2600
Contact Pipe & Modular Fabrication


VIDEOS

LINKS

TESTIMONIALS

“When I saw each pipe spool had the distinctive bright yellow UA Union label and the Scheck Tag attached, I knew these guys were proud of themselves, their Union Brotherhood and the Company. Also, I knew the UA Label Represents a great deal of training by their local union to get these craftsmen to a higher level of workmanship which was made evident to me by the excellent welds on each and every pipe spool.”

 

Ron Webb
Plant Reliability Inspection Specialist
Dakota Gasification Company

UIC